Skip to main content

Simple, Transparent Pricing

Start free, upgrade when you need more. No hidden fees, no surprises.

Free

$0forever

Everything you need to plan a project

  • βœ“Up to 3 projects
  • βœ“Unlimited tasks per project
  • βœ“Interactive Gantt charts
  • βœ“Critical path analysis
  • βœ“Time tracking β€” logged vs estimated per task
  • βœ“AI planning from text, photos & spreadsheets (25 credits/week)
  • βœ“Share with up to 2 collaborators
  • βœ“1 connected app (such as Google Calendar)
  • βœ“Real-time collaboration with live presence
  • βœ“Cloud storage & sync
  • βœ“JSON/CSV import & export
  • βœ“PNG & PDF export (with watermark)
  • βœ“Portfolio timeline & activity feed across all projects
Sign Up Free
Most Popular

Pro

$5/month

For professionals who manage multiple projects

  • βœ“Unlimited projects
  • βœ“250 AI credits/week
  • βœ“AI schedule insights & risk analysis
  • βœ“Project baselines & variance tracking
  • βœ“Custom work calendars & holidays
  • βœ“Premium export templates & layouts
  • βœ“Watermark-free exports
  • βœ“Word document export
  • βœ“Excel Gantt export (.xlsx)
  • βœ“Custom fields β€” up to 20 per project (2 on Free)
  • βœ“Invite up to 4 project collaborators with editor roles
  • βœ“Unlimited connected apps
  • βœ“Sync Google and Outlook calendars together
  • βœ“Priority email support
Start 14-day free trial

Then $5/month Β· cancel anytime before day 14.

Teams

$5/member/month

For teams that share one workspace β€” roles, Operations & pooled AI

  • βœ“Everything in Pro
  • βœ“2 full workspace members minimum ($10/month)
  • βœ“Add or remove full members at $5/member/month
  • βœ“One consolidated subscription for the workspace
  • βœ“Owner / Admin / Member / Viewer roles
  • βœ“Operations β€” recurring meetings, maintenance & routines
  • βœ“250 AI credits/week per member, pooled across the workspace
  • βœ“Shared workspace settings
  • βœ“Priority email support
Start 14-day free trial

Then $5/member/month Β· cancel anytime before day 14.

Need SSO, provisioning, or custom terms? Contact us β†’

Advanced PM (included)

Pro

  • Scheduling Working-time calendars, constraints, task modes and the hour-based schedule. Every other module builds on it.
  • Resources Resource Sheet, assignments with units and work, the Resources, Usage and Team Planner views, leveling.
  • Costs Rates, fixed costs, planned and actual cost per task, earned value in Reports.
  • Tracking & baselines Status date, Baseline 1–10 and interim plans, Update Project, Mark on Track, the Tracking Gantt.
  • Tables & filters Entry table beside the Gantt bars, named tables (Cost, Schedule, Tracking…), AutoFilter, grouping and multi-sort.
  • Gantt Pro Progress line, task path, split bars, multiple baselines, slippage lines, timescale tiers and view presets in the Gantt's eye menu.
  • Network diagram The Network diagram view: tasks as boxes linked by their dependencies.
  • Reports The Reports view: overview, burndown, milestones, costs, resources and earned value, printable.
  • Formulas & indicators Formula, lookup and outline-code custom fields with graphical indicators and roll-ups.
  • Master projects Subprojects inside a master project and links between tasks of different projects.

Teams

Everything in Pro

  • Operations Repeating operations and processes for the whole workspace.

Frequently Asked Questions

What happens to my data if I downgrade?

Your data is always yours. If you downgrade, you keep all existing projects but cannot create new ones beyond the free limit. Nothing is ever deleted.

Is my data secure?

Absolutely. Your project data is securely stored in the cloud using industry-standard encryption. Access your projects from any device when signed in.

Can I cancel anytime?

Yes. During the 14-day free trial you can cancel with no charge. After the trial, you can cancel monthly or yearly billing at any time and keep your paid features until the end of the period. A cancelled Team workspace remains intact and read-only.

What are AI credits?

Every AI feature draws from one weekly credit balance that resets on Monday at 00:00 UTC. Generating a plan or a process costs 5 credits, adding tasks with AI 3, schedule insights 3, and a status summary or an @ai comment 1. Free includes 25 credits a week, Pro 250, and Teams 250 per paid member, pooled across the workspace. Credits for a generation that fails on our side are returned.

What are AI schedule insights?

AI schedule insights are a Pro feature that analyzes your project and surfaces risks, optimization opportunities, and recommended next actions. Results are cached for 24 hours, so reviewing the same unchanged schedule again uses no extra AI credits.

Can I try a paid plan before upgrading?

Yes β€” every new Pro or Team subscription starts with a 14-day free trial. You receive full access to the selected plan during the trial and are not charged if you cancel before it ends.

Do you offer annual billing?

Yes. Pro is $45/year, and Team is $45 per member/year with a 2-member minimum. Both are 25% below monthly billing.

What counts as a connected app?

A connected app is an outside account you link to LoopGantt, such as Google Calendar, Outlook, Slack or GitHub. Free includes one connected app, such as one calendar; Pro and Teams include as many as you need, so you can sync Google and Outlook calendars together. Your calendar feed link, calendars you subscribe to, API keys and webhooks don't count. Apps you already connected keep working, and you can always reconnect the same app.

Do I need to create an account?

Yes β€” creating a free account takes a few seconds and unlocks the full Gantt editor, cloud sync, AI-powered planning, and critical path analysis. No credit card required for the Free plan.

Your Next Project Plan Is Seconds Away

Start for free. No credit card required.